Power infrastructure

Grid Works

Civil and cabling partner for power distribution build-out across the Al Bahah, Najran and Sharurah regions.

Trench excavated beside the substation
07Trench excavated beside the substation
Our role
Civil and cabling partner
Sector
Power distribution
Region
Al Bahah, Najran, Sharurah, Al Qunfudhah
Period
Since 2025
Scope
Civil works and cabling

SBL crews deliver the ground works behind the southern grid: reinforced concrete substation foundations and cable channels, rock excavation and trenching, UPVC duct banks and cable pulling, galvanized steel poles set on cast bases, and full asphalt reinstatement once each run is closed.

Work moves site to site, from Al Bahah and Najran to Sharurah and Al Qunfudhah, each with a barrier-protected work zone and a morning safety briefing.

Each site gets a barrier-protected work zone and a morning safety briefing.

Contact sheet

From the site.

Photographed by our crews during the work. Select a frame to see it full screen.

  1. 01Ducts laid along a substation fence

  2. 02Reinforcement for a cable channel base

  3. 03Crew inside a cable channel before the pour

  4. 04Formwork along the cable channel walls

  5. 05Saw cutting the slab for a duct crossing

  6. 06Galvanized pole set on its cast base

  7. 07Trench excavated beside the substation

  8. 08Night shift trimming the trench walls

Your site

Need a crew on site?

Tell us the scope, the location and the working window, and we will come back with a plan.