Power infrastructure
Rabigh 2
Overhead transmission tower erection on the Rabigh 2 power plant expansion: steel assembly, crane lifts and high-level rigging beside an energised switchyard.

- Project
- Power plant expansion
- Sector
- Power transmission
- Region
- Rabigh, Makkah Province
- Period
- 2026
- Scope
- Tower erection
On site
SBL crews build the high voltage lattice towers that carry power out of the Rabigh plant. Galvanized angle sections are laid out and bolted into panels on the ground, craned into position on cast concrete pad foundations, then plumbed and torqued section by section as the tower grows.
Riggers work at height on full fall arrest with a set climbing sequence, a banksman on the crane and an ambulance held on site for every lift.
Because the new line runs beside live circuits, each shift starts with a permit check and an exclusion zone set around the structure.
Each shift starts with a permit check and an exclusion zone.
Contact sheet
From the site.
Photographed by our crews during the work. Select a frame to see it full screen.
01Towers rising beside the switchyard
02Crane lift on a lattice tower
03Upper section craned into place
04Riggers bolting the top of the tower
05Tower legs on cast pad foundations
06A completed lattice tower
07Crane holding a section during bolting
08Riggers working at height
09Angle sections laid out for assembly
Your site
Need a crew on site?
Tell us the scope, the location and the working window, and we will come back with a plan.