Power infrastructure

Rabigh 2

Overhead transmission tower erection on the Rabigh 2 power plant expansion: steel assembly, crane lifts and high-level rigging beside an energised switchyard.

Upper section craned into place
03Upper section craned into place
Project
Power plant expansion
Sector
Power transmission
Region
Rabigh, Makkah Province
Period
2026
Scope
Tower erection

SBL crews build the high voltage lattice towers that carry power out of the Rabigh plant. Galvanized angle sections are laid out and bolted into panels on the ground, craned into position on cast concrete pad foundations, then plumbed and torqued section by section as the tower grows.

Riggers work at height on full fall arrest with a set climbing sequence, a banksman on the crane and an ambulance held on site for every lift.

Because the new line runs beside live circuits, each shift starts with a permit check and an exclusion zone set around the structure.

Each shift starts with a permit check and an exclusion zone.

Contact sheet

From the site.

Photographed by our crews during the work. Select a frame to see it full screen.

  1. 01Towers rising beside the switchyard

  2. 02Crane lift on a lattice tower

  3. 03Upper section craned into place

  4. 04Riggers bolting the top of the tower

  5. 05Tower legs on cast pad foundations

  6. 06A completed lattice tower

  7. 07Crane holding a section during bolting

  8. 08Riggers working at height

  9. 09Angle sections laid out for assembly