Live carriageway works across Riyadh: lane staging, asphalt cutting and full surface reinstatement, opened and closed inside a single night window.
- 1Saw-cut edge
- 2Wearing course
- 3Binder course
- 4Backfill, compacted in layers
- 5Warning tape
- 6Sand bedding
- 7Cable in duct
- 8Existing pavement
- 9Thermoplastic marking
- 10Traffic barrier
- Sector
- Traffic infrastructure
- Region
- Riyadh
- Period
- 2025 to 2026
- Scope
- Reinstatement and markings
On site
Every shift follows the same sequence. Lanes are taken with cones, barriers and advance warning so traffic keeps moving past the site. The surface is saw-cut and milled to a clean edge for the run beneath, then the trench is backfilled, compacted and reinstated in asphalt to the original profile.
The site closes with the markings put back: lane lines, stop bars and pedestrian crossings laid in thermoplastic, kerbs repainted, so the road is handed over finished rather than patched.
Handed over finished, not patched.
Contact sheet
From the site.
Photographed by our crews during the work. Select a frame to see it full screen.
01Barrier line along a live carriageway
02Lit barriers around the night work zone
03Warning tape over the backfilled cable
04Hand excavation beside the median
05Milled surface ready for asphalt
06Fresh asphalt across the junction
07Asphalt laid and raked at night
08Pedestrian crossing laid in thermoplastic
09Crossing and stop bar restored at dawn