Telecommunications

STC Rollout

Multi-site 4G deployment and capacity upgrades across STC's network in the Aseer region: tower works, equipment shelters and site power.

Riggers at height on the antenna mount
01Riggers at height on the antenna mount
Client
STC
Sector
Telecommunications
Region
Aseer region
Period
2019 to 2020
Scope
RAN build and upgrade

SBL field teams carried out carrier additions and upgrades (L800, L2100 and TDD) on live cellular sites: antenna and RRU rigging on lattice and rooftop towers, feeder and fibre runs, equipment shelter fit-out with DC power systems and standby generators, and the outdoor distribution and metering work that keeps each site energised.

Every climb ran under full fall protection and permit control, with a daily toolbox talk before work began.

Every climb under full fall protection and permit control.

Contact sheet

From the site.

Photographed by our crews during the work. Select a frame to see it full screen.

  1. 01Riggers at height on the antenna mount

  2. 02Lattice tower, Aseer region

  3. 03Preparing radio unit cabling on the ground

  4. 04DC power and battery work in the shelter

  5. 05Running power cable beside the generators

  6. 06Hauling a line up to the tower

  7. 07Equipment shelter under the lattice tower

Your site

Need a crew on site?

Tell us the scope, the location and the working window, and we will come back with a plan.