Telecommunications
Tahakom
Civil works delivery partner on the Tahakom telecommunications infrastructure framework, building the underground duct network beneath Riyadh's road corridors.

- Client
- Tahakom
- Our role
- Civil works delivery partner
- Sector
- Telecommunications
- Region
- Riyadh
- Period
- Since 2026
- Scope
- Duct network and civil works
- Contract
- Framework agreement
On site
Under the framework agreement, SBL crews install the buried backbone for Tahakom's traffic and telecom systems: micro-trenching, UPVC class 4 duct banks, precast concrete manholes and hand-holes with cast iron covers, cable and rope pulling, and galvanized steel poles set on reinforced concrete foundations.
Every run is encased in concrete and closed with full asphalt reinstatement.
The work runs at night under live traffic along the Al Aziziyah corridor, with lane closures and warning signage to the specifications of the Ministry of Transport, the Ministry of Interior and the Ministry of Municipal Affairs. Foundation levels are checked with a spirit level before backfill.
The backbone goes in at night, under live traffic.
Contact sheet
From the site.
Photographed by our crews during the work. Select a frame to see it full screen.
01Pole foundation set in the duct trench
02Saw cutting along the kerb line
03Precast hand-hole placed in its trench
04Lane closure and the night crew at work
05Cutting the trench route, night shift
06Bedding material tipped into the trench
07Manhole pit excavated to founding level
09Foundation bolts checked with a spirit level