Telecommunications

Tahakom

Civil works delivery partner on the Tahakom telecommunications infrastructure framework, building the underground duct network beneath Riyadh's road corridors.

Lane closure and the night crew at work
04Lane closure and the night crew at work
Client
Tahakom
Our role
Civil works delivery partner
Sector
Telecommunications
Region
Riyadh
Period
Since 2026
Scope
Duct network and civil works
Contract
Framework agreement

Under the framework agreement, SBL crews install the buried backbone for Tahakom's traffic and telecom systems: micro-trenching, UPVC class 4 duct banks, precast concrete manholes and hand-holes with cast iron covers, cable and rope pulling, and galvanized steel poles set on reinforced concrete foundations.

Every run is encased in concrete and closed with full asphalt reinstatement.

The work runs at night under live traffic along the Al Aziziyah corridor, with lane closures and warning signage to the specifications of the Ministry of Transport, the Ministry of Interior and the Ministry of Municipal Affairs. Foundation levels are checked with a spirit level before backfill.

The backbone goes in at night, under live traffic.

Contact sheet

From the site.

Photographed by our crews during the work. Select a frame to see it full screen.

  1. 01Pole foundation set in the duct trench

  2. 02Saw cutting along the kerb line

  3. 03Precast hand-hole placed in its trench

  4. 04Lane closure and the night crew at work

  5. 05Cutting the trench route, night shift

  6. 06Bedding material tipped into the trench

  7. 07Manhole pit excavated to founding level

  8. 09Foundation bolts checked with a spirit level